- Remove, clean, ready safety cover for storage.
- Prepare pump, filter, salt system, etc for start up.
- Install ladder, rails, diving board, etc.
- Prime and start pump, add spring chemicals, circulate water and check for leaks around the equipment.
- Pool will be brushed so filter can remove particles.
- The pool should be full to leave it running when we are finished, if not the pump will be shut off and ready to restart when homeowner tops up their pool.
- Opening includes Spring Start up Chemical Package.
- Pools with Safety Covers usually open with poor visibility. Standard pool opening package does not guarantee a clear pool.